Project scale at fabrication scope

Ang phase one ng BYD industrial park ay binubuo ng 12 factory buildings na may humigit-kumulang 141,900 m² na gross floor area. Nakatala sa kasalukuyang case record ang humigit-kumulang 15,000 metric tonnes sa structural-steel fabrication package ng Jiangxin. Hindi awtomatikong nangangahulugan ang bilang na ito na iyon ang total steel tonnage ng buong park o na saklaw ang lahat ng design, construction at erection work.

Hatiin ang production plan ayon sa zone

Hinahati ang bill of materials ayon sa building, zone, member type at delivery batch. Iniuugnay dito ang material procurement, cutting, fit-up, welding, straightening, inspection at coating upang tumugma ang shop output sa kailangan ng site.

First article para sa repeated members

Kailangan pa rin ng first-article approval ang repeated welded built-up H-sections, columns, beams at brace members. Sinusuri ang material, section dimensions, hole groups, connection plates, welds, piece marks at coating interfaces. Pagkatapos ng approval, maaaring ulitin ang fixtures, CNC programmes at inspection datums para sa parehong batch.

Consistency, coating at phased delivery

Dapat manatiling magkakaugnay ang material heats, piece marks at inspection records. Hinihiwalay at minamarkahan ang accepted, pending, repair at revised members. Bago ang coating, pinoprotektahan ang connection surfaces, holes at field-weld areas ayon sa specification; sinusuri ang surface preparation at DFT laban sa project documents. Inaayos ang shipment lots ayon sa erection sequence upang sabay dumating ang columns, beams, bracing at connection items na unang kailangan. Ang final tonnage at responsibilities ay pinamamahalaan ng kontrata at approved documents.