Gawing executable delivery checklist ang project requirements
Dapat tukuyin sa contract, approved drawings, coating specification, inspection and test plan (ITP) at packing requirements ang surface preparation grade, coating system, dry film thickness (DFT), uncoated areas, piece marks, packing method, transport limits, document language at release points. Hindi nangangahulugan ang factory capability na applicable ang isang standard sa lahat ng proyekto.
Surface preparation at coating
May shot-blasting capability ang Jiangxin at maaaring magbigay ng grades kabilang ang Sa 2½ kapag specified. Dapat suriin ang cleanliness, surface condition at coating environment. Nakabatay sa approved coating specification ang primer, intermediate coat, topcoat, number of coats at DFT; hindi dapat ipagpalagay ang fixed three-coat system o fixed thickness.
Identification at packing
Dapat naka-link ang piece marks sa fabrication drawings, inspection records, packing lists at erection drawings. Maaaring kasama sa approved shipping marks ang project number, case o bundle number, destination, weight at lifting instructions. Isinasaalang-alang sa packing plan ang member length, centre of gravity, lifting points, coating protection, end plates, bevels, dunnage, separation at restraint points.
Container loading, phased shipment at quality dossier
Sinusuri ng container loading plan ang individual weights, weight distribution, unloading sequence at destination conditions. Dapat tumugma ang shipment lots sa site zones at erection sequence, na may sariling packing list at release status. Maaaring kabilang sa quality dossier ang mill test certificates, material traceability, dimensional inspection, NDT, coating inspection, release notes at packing lists ayon sa kontrata. Kailangang hiwalay na kumpirmahin ang customs clearance, ocean freight, destination handling at erection sa kontrata at agreed Incoterm.
